If you want to use insulating concrete forms to construct basements, underground car parks or garages, talk to ECO Block Australia today.  

Our construction method is simple and strong, and building an ICF basement or garage is a fast 3-step process. We believe our wall system is one of the strongest and most versatile in the world.  

Learn more below or talk to ECO Block about our unrivalled basement construction and car park construction material today.  

Enquire Online
Free Call 1800 669 696

ECO Block Features

Branz Certified & NCC Compliant

25mpa to 40mpa at 30 days

Thermal R-Value = 3.78

Acoustic Party wall certificate

Fire Resistant Level of 90/90/90 for 230 Series Wall, and Level 180/180/180 for 280 Series Wall

230mm and 280mm wall = NCC deemed to satisfy requirement of DNTW + Ctr = 45

Certified for use in Bushfire Zones up to BAL- FZ (Highest rating available)

Cyclone rated to Category Five

Benefits

  • Construction speed and strength 
  • Versatility to act as retaining walls, be sealed or used in insulated basements and car parks 
  • A vast range of finishes can be applied, waterproofing the outside that sits against the earth. However, you can finish the inside with whatever you like. Render is one of the most popular, but you can also screw directly into the product and may choose to finish with plasterboard 
  • You can build the next level or upper levels directly off ECO Block in the same material  
  • Flexibility with shape and size 

Individual Applications

  • Residential  
  • Commercial  
  • Industrial 

Insulated Concrete Forms: Who Can Use

If you use our product, we want to make sure it’s used correctly, and you get maximum benefits.

Access Training Here >>

ICF Building: Our Process

  • ENQUIRE

    Get in touch with ECO Block by calling 0400 301 411 or send us a message here.

  • DESIGN

    If need be, we’ll put you in touch with builders and architects who work closely with the ECO Block team to ensure you have the right people working on your project. 

  • TRAINING

    We offer training on-site for builders and provide the latest technical information to your architect or builder.

  • BUILD

    There are three steps in the construction phase – stack, brace and pour.

Basement Construction Methods

ECO Block is a sturdy and energy-efficient insulated concrete formwork system, perfect for basement and car park construction projects.  

Reach out to our friendly team today to learn more.